The history of the company began with the idea of building the company capable of producing the connecting parts of pipelines the feature of which will be improved reliability, quality, and speed of production.

The design contract was signed with a leading industry institute, which in a short time prepared the engineering design documentation for construction.

Started construction of the administration and on-site building for plant, boiler house, auxiliary buildings and grounds.

Started construction of an industrial building.


Mounting of the main equipment in the production casing is underway .

  • Branches stamp-welded and stamped sharply-bent
  • Tees stamp-welded
  • Tees welded
  • The bottoms elliptical stamped
  • Transition pieces welded and stamp-welded concentric
  • Units of pipelines assembling